Active form of COP-2 serves for the acceptance of completed construction works contractors. It reflects the cost of all work done by the contractor at the current level of prices. Act form of COP-2 form, where the contractor has filled the form on the act of work performed and complied with all building and construction works, and the customer is not has no claim to it. Following the approval of awarding the contract the contractor based on the data from this paper is Help for the cost of work performed and costs (the act form COP-3). After which the customer on the basis of this certificate pays the contractor. The act of acceptance of work performed by the COP-2 forms: Form Download Form CS-2 consists of a front side and tables. Main part. The act of acceptance of work performed is a two-way: To be completed by the contractor and the customer. Line Investor filled as directed by the Customer. Therefore, even if the contract appears investor, he does not sign this act. In the "Customer (Principal)" and "The contractor (subcontractor)" indicate the corresponding coordinates of contractors: The name (full or abbreviated, but must be specified), address, telephone and fax (details not required). Activities of each of the contractors can be included in the relevant particulars "OKPO. In the "Construction" specifies the common name of all construction projects, which are provided in the contract, as well as the address. In the "object" only the identity of the object on which work is underway. If you have several (for example, garage, house), then this line should indicate precisely the object on which to implement the relevant work. The relevant details of "the contract agreement (contract) is indicated by its number and date of preparation. Below, in the "Act on acceptance of work performed by" filling details: document number (the act), his date of preparation and the period for which he composed. Also in the column "Estimated (negotiated) price in accordance with the work contract (subcontract)" noted the estimated cost, which corresponds to the specified value in the work contract. Proceed to the table. The column "Number" is divided into two graphs: 1-serial number works, and 2-numbering position estimates. In item 3, "Name" are written the names of all stages of works, facilities, equipment, launch complexes, costs, Column 4 indicates the number in the first column SNIP (prices on all construction work). If all the prices of construction and repair work in the contract, the graph in cells 4, and 7 put the dashes. Column 5 indicates the nomenclature (units, meters, etc.), except%. Column "Completed Work" has the following columns are required: 6 - number of the volume of work performed in the appropriate units of measurement (see graph 5), 7 - price per unit of work performed in the rub. according to the SNIP; 8-value of the work (the multiplication of the cell counts 6 and 7). The cost of work performed is taken into account in the COP-2, excluding VAT. Based on the COP-2 is a form of COP-3, these primary documents are filled and treated as a whole. COP-3 confirms the value of all work performed by the contractor. On the structure of form in general is similar to the COP-2, only the table has 6 columns and separately stated amount of VAT and the amount of work performed, including VAT. The act of acceptance of work performed by the COP-2 forms: Form download
No comments:
Post a Comment